Capture the gas Alberta burns. Build the partnership that owns it.
Tarrabin Consulting brings Akron-BMS membrane gas separation to energy producers in Wood Buffalo and the Gulf. We structure the partnership, build the business case and run the project from the first call to a working pilot.
One contact between the technology, the producer and the Nation.
Membrane separation splits a gas stream by how fast each gas moves through a polymer film. Placed at a flare, it pulls CO₂ and other saleable gases out of a stream that would otherwise burn.
The technology belongs to Akron-BMS, a joint venture of Akron Engineering Consultants Group Ltd. and Borna Membrane Solutions Inc. Tarrabin Consulting takes it to market, structures the partnership around it and manages the project for the client.
Mohamed Tarrabin, CEO
In 2024 Mohamed led an Akron-BMS partnership proposal in Wood Buffalo, with a model that put the capital risk on the technology partner.
Tarrabin also works with energy partners through its offices in Kuwait, Qatar, Oman and Lebanon.
Six steps from first call to deployed units.
Each step ends with a decision. You can stop at any of them.
Briefing and NDA
Weeks 1 to 2. A 60-minute call, then a mutual NDA.
Gas stream screening
Weeks 2 to 6. Engineers screen the fit and return a go or no-go.
Partnership structure
Weeks 4 to 10. Equity, revenue share and roles, written into an MOU.
Feasibility study
About 6 months. Technical, financial, environmental and social.
Pilot
About 6 months. One unit at one site, measured against the study.
Deployment
12 to 18 months, then ongoing monitoring.
The Athabasca oil sands and the Gulf.
Fort McMurray, Alberta
Head office. 171 Burton Place.
Kuwait
Regional office.
Qatar
Regional office.
Oman
Regional office.
Lebanon
Regional office.
Akron Engineering Consultants Group Ltd.
Engineering partner.
Borna Membrane Solutions Inc.
Membrane technology partner.