Fort McMurray, AlbertaCall (780) 804-7858Email info@tarrabinconsulting.com

Home / Technology / Energy & Environmental Technology

ENERGY AND ENVIRONMENTAL TECHNOLOGY

Energy & Environmental Technology

Commercial feasibility, project-development coordination and technology assessment for industrial gas recovery and separation opportunities. Serving Alberta.

This service at a glance

Who it is for

  • Industrial and energy operators in Alberta
  • Indigenous businesses and development corporations
  • Municipal and economic development organizations

The problem

  • Gas is flared or vented and the value is not known.
  • A technology has been proposed and nobody has tested the business case.

What you get

  • Commercial feasibility
  • Project-development coordination
  • Technology assessment at a planning level

The first conversation

A free 30-minute call about the site, the gas stream and the decision you need to make.

Start that conversation

From a first conversation to a decision package.

Each stage ends with a decision the owner makes. Engineering design and approvals are done by licensed professionals.

From a first conversation to a decision package.Step 1, Opportunity screen: A first conversation about the site, the gas stream and what the owner wants to achieve. Output: Screening note. Then Step 2, Site and data review: The owner provides gas analysis, volumes and site constraints. We list what is missing. Output: Data request and gap list. Then Step 3, Technology options: Recovery and separation options compared at a planning level, with their limits stated. Output: Options comparison. Then Step 4, Commercial feasibility: Costs, revenues, permits and partners tested in a business case. Output: Feasibility summary. Then Step 5, Decision package: A package the owner can take to a board, a lender or licensed engineers for design. Output: Decision package.OpportunityscreenScreeningnoteGO?WorthassessingSite and datareviewData requestand gap listGO?DatacompleteTechnologyoptionsOptionscomparisonGO?OptionsshortlistedCommercialfeasibilityFeasibilitysummaryGO?Casesupportsnext stepDecisionpackageDecisionpackage
Energy and environmental technology advisory stages and decision gates.
  1. 1

    Opportunity screen

    A first conversation about the site, the gas stream and what the owner wants to achieve.

    Output Screening note

  2. 2

    Site and data review

    The owner provides gas analysis, volumes and site constraints. We list what is missing.

    Output Data request and gap list

  3. 3

    Technology options

    Recovery and separation options compared at a planning level, with their limits stated.

    Output Options comparison

  4. 4

    Commercial feasibility

    Costs, revenues, permits and partners tested in a business case.

    Output Feasibility summary

  5. 5

    Decision package

    A package the owner can take to a board, a lender or licensed engineers for design.

    Output Decision package

Start with a free 30-minute call

Terms we keep separate.

  • Gas recoveryCollecting gas or liquids that would otherwise be flared or vented so they can be used or sold.
  • SeparationSplitting a gas stream into parts. Separating carbon dioxide does not store it.
  • Carbon captureSeparating carbon dioxide so it can be used or sent to storage.
  • Permanent storagePlacing captured carbon dioxide underground in an approved formation. This is a separate, regulated activity.
What this page does not claim

Tarrabin Consulting does not design, license or operate gas plants. We do not claim completed installations, performance figures, government endorsement or awarded projects. Engineering design, permits and emissions compliance are the responsibility of licensed engineers and the operator.

Where we work

Alberta. Other regions are discussed case by case.

Contact

Discuss an energy technology opportunity

Call, email or send a request. We reply within one business day.

Request a consultation

We reply within one business day, Monday to Friday. Or call (780) 804-7858.

CallEmailConsultation